Can you pave during Dubai summer?
The question every procurement manager asks first.
Yes — and we've built our entire operation around it. All municipality patching contracts and commercial resurfacing runs between midnight and 05:30 during June–September. Our hot-mix plants run on night-shift schedules, tipper trucks maintain temperature in transit, and our paving crews are MOHRE heat-stress certified. The 160°C mix hits the screed and goes down before the desert takes it.
Work window
00:00 – 05:30
Mix temp at screed
≥ 150°C
Crew certification
MOHRE 2026
Summer track record
847 km paved across Dubai summers since 2011
Verified by
ISO 9001 QA/QC on every pour
Do you handle municipality permits?
The paperwork that stalls more RFQs than budgets do.
We manage the full permit chain in-house: RTA No-Objection Certificates, Dubai Municipality road-opening permits, DEWA and Etisalat utility coordination, and BPS eNOC digital submissions. Our permit coordinator has 9 years of direct RTA relationships. Average approval time on arterial road works: 6 business days. We include permit costs in the fixed-price quote so your budget doesn't shift.
RTA NOC avg
6 business days
eNOC via BPS
Digital submission
Permit cost
Included in quote
Permit success rate
320+ permits processed without client escalation

Verified by
ISO 9001 QA/QC on every pour
What's your minimum project size?
We work with logistics bays and arterial roads alike.
No minimum. A single loading bay at 200 m² gets the same crew discipline, nuclear density test, and structural warranty as a 40,000 m² villa community handover. Small jobs are quoted at AED 45–55/m² all-in. Large contracts (above 5,000 m²) are tendered with volume pricing. We've resurfaced everything from DAFZA warehouse aprons to the main access roads at Dubai South — the process is identical, the scale adjusts.
Minimum area
No minimum
Small jobs
AED 45–55/m²
Warranty
5-yr structural
Transparent pricing
AED 25–55/m² depending on area and mix type

Verified by
ISO 9001 QA/QC on every pour
Got a project in mind? Our team responds within 4 business hours.
Request a Site AssessmentTarmac Capability Statement
2026 Edition · 14 pages
Fleet inventory — 24 pavers, 18 rollers, 6 millers
ISO 9001 & 14001 certificate copies
RTA approved contractor reference list
Project portfolio: 40+ completed sites
QA/QC methodology and test protocols
Summer operations procedure
Enter email to unlock
Still comparing contractors?
Download our full capability statement — fleet size, ISO certificates, RTA reference list, and completed project portfolio. One PDF, everything procurement needs to put us on a shortlist.
No spam. One email, one PDF. Unsubscribe any time.
