RTA Approved Contractor · Dubai Municipality Registered
1,200+km

Paved across the UAE

14yr

Dubai track record

ISO

9001 & 14001 Certified

48hr

Mobilization guarantee

Pavers and rollers deployed across Jebel Ali Industrial, Dubai South, Al Quoz, and villa compounds — before the desert heat closes the window.

Aerial drone shot of freshly paved asphalt road stretching toward Dubai skyline at golden hour with amber lane markings

Surface Temp

160°C

Hot-mix laid at spec

Compaction

98%

Nuclear density verified

Mobilization

48 hr

Guaranteed on-site

Jebel Ali Industrial
Dubai South
Al Quoz Industrial
DAFZA
Dubai Investment Park
Dubailand Villa Communities
Arabian Ranches
Jumeirah Golf Estates
Municipality Arterial Roads
Loading Bay Resurfacing
Nighttime Road Patching
RTA-Approved Works
Jebel Ali Industrial
Dubai South
Al Quoz Industrial
DAFZA
Dubai Investment Park
Dubailand Villa Communities
Arabian Ranches
Jumeirah Golf Estates
Municipality Arterial Roads
Loading Bay Resurfacing
Nighttime Road Patching
RTA-Approved Works
FAQ 01

Can you pave during Dubai summer?

The question every procurement manager asks first.

Yes — and we've built our entire operation around it. All municipality patching contracts and commercial resurfacing runs between midnight and 05:30 during June–September. Our hot-mix plants run on night-shift schedules, tipper trucks maintain temperature in transit, and our paving crews are MOHRE heat-stress certified. The 160°C mix hits the screed and goes down before the desert takes it.

Work window

00:00 – 05:30

Mix temp at screed

≥ 150°C

Crew certification

MOHRE 2026

Summer track record

847 km paved across Dubai summers since 2011

Night paving operation with asphalt paver machine laying hot-mix under floodlights on Dubai road

Verified by

ISO 9001 QA/QC on every pour

FAQ 02

Do you handle municipality permits?

The paperwork that stalls more RFQs than budgets do.

We manage the full permit chain in-house: RTA No-Objection Certificates, Dubai Municipality road-opening permits, DEWA and Etisalat utility coordination, and BPS eNOC digital submissions. Our permit coordinator has 9 years of direct RTA relationships. Average approval time on arterial road works: 6 business days. We include permit costs in the fixed-price quote so your budget doesn't shift.

RTA NOC avg

6 business days

eNOC via BPS

Digital submission

Permit cost

Included in quote

Permit success rate

320+ permits processed without client escalation

Construction permit documents and engineering drawings spread on desk with Dubai municipality stamps

Verified by

ISO 9001 QA/QC on every pour

FAQ 03

What's your minimum project size?

We work with logistics bays and arterial roads alike.

No minimum. A single loading bay at 200 m² gets the same crew discipline, nuclear density test, and structural warranty as a 40,000 m² villa community handover. Small jobs are quoted at AED 45–55/m² all-in. Large contracts (above 5,000 m²) are tendered with volume pricing. We've resurfaced everything from DAFZA warehouse aprons to the main access roads at Dubai South — the process is identical, the scale adjusts.

Minimum area

No minimum

Small jobs

AED 45–55/m²

Warranty

5-yr structural

Transparent pricing

AED 25–55/m² depending on area and mix type

Aerial view of freshly paved loading bay at Dubai logistics park with lane markings being applied

Verified by

ISO 9001 QA/QC on every pour

Got a project in mind? Our team responds within 4 business hours.

Request a Site Assessment

Request a
Site Assessment

Tell us the zone, the scale, and how you want to be reached. Our estimator will respond within 4 business hours with a preliminary scope and pricing range.

Fixed-price quote — no variation orders

As-built drawings and structural warranty on handover

Nuclear density test certificate included

No commitment required. Responses within 4 business hours, Sunday–Thursday.

Tarmac Capability Statement

2026 Edition · 14 pages

Fleet inventory — 24 pavers, 18 rollers, 6 millers

ISO 9001 & 14001 certificate copies

RTA approved contractor reference list

Project portfolio: 40+ completed sites

QA/QC methodology and test protocols

Summer operations procedure

Enter email to unlock

Still comparing contractors?

Download our full capability statement — fleet size, ISO certificates, RTA reference list, and completed project portfolio. One PDF, everything procurement needs to put us on a shortlist.

No spam. One email, one PDF. Unsubscribe any time.